✉ sales@mainrockdrill.com
Get a Quote

Home / Industries / Tunnel & foundation

Tunnel & Foundation Drilling Solution

Probe drilling, pipe-roof holes and anchor cable holes in confined spaces, needing compact equipment and accurate holes.

Scope of work

  • Tight faces (6–12 m tunnel section) limit equipment size and rod length
  • Probe holes are usually upward or near-horizontal, making cuttings removal hard
  • Collapsing ground needs casing-while-drilling, which puts a premium on coupling and shank accuracy
隧道与基坑作业场景

Field tips

1

For upward holes, increase flushing air and pull back periodically to stop cuttings falling and jamming

2

Use casing-while-drilling in collapsing ground, keeping 10–15 mm clearance to the bit

3

Couplings and shanks made to R32 / T38 to match the rock drill on site